Ford VEV Test Professionals- Automotive Testing




YOU YANGS
PROVING GROUND


Lara, Australia

YYPG Constant Speed Track (CST)


 

Testing Facilities

  • Constant Speed Track (CST)
  • Unimproved Roads
  • Mud Bath
  • Skid Pads
  • Water Bath
  • Dust Test Road
  • Steering and Handling Road
  • NVH Ride Roads
  • 4x4 and 4x2 Durability Test Roads
  • Off-Road 4x4 Circuit
  • Vehicle Dynamics Area (VDA)
  • Gravel Road and Skid Pad
  • Traction Control Events
  • Low Friction Surfaces
  • Pipe half rounds
  • Roll undulation
  • Rope Road

Special Structural Test Events

  • Body Twist
  • Broken & Patched Surface
  • Chuck Holes
  • Belgian Blocks
  • Cobblestones
  • Square Edge Pot Hole
  • Washboard
  • Crowned Intersection
  • Twist Ditch
  • Power Hop Hill
  • Simulated wheel fight
  • Curb impact

YYPG Aerial Photo

 

Emission Laboratory

  • Certification/Development/Evaluation
  • 3 Test Cells-Gas/Diesel/LPG
  • ADR79-00,01 & 02(Euro 2/3/4)
  • Type 1 to 6 tests
  • Bag, Modal & Catalyst Efficiency Analysis
  • Particulate Measurement-ISO Class 5 Clean Room
  • In-Service Compliance Checks
  • OBD Development
  • VVVT Shed
  • Fuel Economy & Tailpipe Emissions development
  • -30C to +55C Emissions Chamber
  • Soak Space for 25 Vehicles
  • Real-time Soot measurement
    • FEV FTIR Analysis
    • Micro Soot Sensor
Emissions Chamber and Dyno
Emissions testing

 

Environmental Wind Tunnel

  • Medium Wind Tunnel
    • Top speed: 160 km/h
    • Temps from -18C to +52C
    • Humidity - ambient to 90% Rh.
    • Solar simulation-Range 0 to 1400W/m2
    • AWD chassis dyno (48 rolls) top speed 200kph
  • Soak Chambers
    • 2 off with range -40C to +52C
    • 1 off with range down to - 20C,
    • Six vehicle capacity
Wind Tunnel


ABOUT US   -   FACILITIES   -   CONTACT   -   HOME

© 2013 Ford Motor Company - All Rights Reserved
www.testprofessionals.com